Rail punctuality (trains on time)
Great Britain · 2014–2025 · % of station stops · from Office of Rail and Road
66.5Latest whole year, 2025 average · % of station stops
68.4Average so far, Q1–Q2 2026 · part-year
+2.7 ptschange since 2015
76.6Highest, 2020
61.7Lowest, 2016
% of station stops · Great Britain · 2026 covers Q1–Q2 only · source: ORR passenger rail performance
About this figure
- The industry's 'On Time' measure: the share of recorded station stops a train reached within 59 seconds of the timetable. It is much stricter than the old Public Performance Measure, which allowed five minutes (ten for long-distance) at the final destination only, so On Time reads some 20 points lower for the same railway
- Each year is the simple average of ORR's four quarterly figures for that calendar year
- The first year (2014) is partial — April to December only — and the latest year is partial too, covering only the quarters published so far. Because October to December is always the worst quarter (leaf fall), a partial year will read differently from a full one
- Punctuality jumped in 2020 and 2021 because far fewer trains ran during the pandemic, not because the railway got better
- PPM is still published, but ORR's national PPM table only starts in 2019-20, so On Time gives the longer consistent series
Every published year
12 values, % of station stops
| Year | % of station stops |
|---|---|
| Q1–Q2 2026 (part-year) | 68.4 |
| 2025 | 66.5 |
| 2024 | 67.0 |
| 2023 | 67.6 |
| 2022 | 68.8 |
| 2021 | 75.2 |
| 2020 | 76.6 |
| 2019 | 65.2 |
| 2018 | 62.3 |
| 2017 | 63.3 |
| 2016 | 61.7 |
| 2015 | 63.8 |
| 2014 | 64.0 |
More on transport
- Local bus passenger journeysGreat Britain
- Motor vehicle flowGreat Britain
- Rail passenger journeysGreat Britain
- Road casualties, all severitiesGreat Britain
- Road deathsGreat Britain
- Road trafficGreat Britain
- Battery electric share of new carsUK
- New battery electric cars registeredUK
- Public electric vehicle chargersUK