polyoptic

Rail punctuality (trains on time)

Great Britain · 2014–2025 · % of station stops · from Office of Rail and Road

66.5Latest whole year, 2025 average · % of station stops
68.4Average so far, Q1–Q2 2026 · part-year
+2.7 ptschange since 2015
76.6Highest, 2020
61.7Lowest, 2016
Rail punctuality (trains on time), 2014 to 2026, % of station stops6570752014201520162017201820192020202120222023202420252026

% of station stops · Great Britain · 2026 covers Q1–Q2 only · source: ORR passenger rail performance

Open in the explorer → Download CSV

About this figure

  • The industry's 'On Time' measure: the share of recorded station stops a train reached within 59 seconds of the timetable. It is much stricter than the old Public Performance Measure, which allowed five minutes (ten for long-distance) at the final destination only, so On Time reads some 20 points lower for the same railway
  • Each year is the simple average of ORR's four quarterly figures for that calendar year
  • The first year (2014) is partial — April to December only — and the latest year is partial too, covering only the quarters published so far. Because October to December is always the worst quarter (leaf fall), a partial year will read differently from a full one
  • Punctuality jumped in 2020 and 2021 because far fewer trains ran during the pandemic, not because the railway got better
  • PPM is still published, but ORR's national PPM table only starts in 2019-20, so On Time gives the longer consistent series

Every published year

12 values, % of station stops
Year% of station stops
Q1–Q2 2026 (part-year)68.4
202566.5
202467.0
202367.6
202268.8
202175.2
202076.6
201965.2
201862.3
201763.3
201661.7
201563.8
201464.0

Download as CSV · See it in the fetch log

More on transport